
General Specifications
Wet laboratory enabled building
Approx. 32,000 m2
Biosafety Level 3 / PRC P3 Lab provisions enabled
BEAM Plus New Buildings V2.0 Provisional Platinum
BEAM Plus Neighbourhood V1.0 Platinum
LEED Building Design + Construction Pre-Certification Gold
Green Building Award 2023 - Merit Award
(Project Under Construction and/or Design - Commericial )



Building 8
G/F Approx. 590 m2
1-8/F (4/F omitted) Approx. 1,900 m2
Building 9
G/F Approx. 790 m2
1-8/F (4/F omitted) Approx. 2,000 m2
G/F Approx. 5.75 m
1-8/F (4/F omitted) Approx. 4.62 m
7.5kPa
Approx. 9.3 m2 / TR for tenant area
General exhaust shaft to roof level at each unit
365 VA/sq m for G/F
294 VA/sq m for 1/F - 8/F (4/F omitted)
Various gas and purified water (Type II) supply
Centralized neutralization system for chemical disposal
Emergency exhaust, emergency shower and eye-washer provided at corridors
General & Key Building Specifications
Wet laboratory enabled building
Research and development
Biosafety Level 3 / PRC P3 Lab provisions enabled
Approx. 32,000 m2
8 levels (G/F-7/F) of Wet lab. and basement for carpark with loading/unloading bay
Approx. 590 m2 for G/F
Approx. 1,900 m2 for 1/F-7/F
Approx. 790 m2 for G/F
Approx. 2,000 m2 for 1/F-7/F
Approx. 5.95 m for G/F
Approx. 4.80 m for 1/F-7/F
Approx. 5.75 m for G/F
Approx. 4.62 m for 1/F-7/F
Approx. 4.85 m for G/F
Approx. 4.00 m for 1/F-7/F
Typical 2.8 m
N/A
7.5kPa
VC-A for G/F-1/F
8 nos. at G/F for tenant storage use
IGU Glass
Dedicated intake and exhaust lourves
Passenger Lift: 4 nos. of 1,350 kg
Clear Door Dimension: 1100 x 2300 mm
Services Lift: 1 no. of 2,500 kg
Clear Door Dimension: 1800 x 2600 mm
Fireman Lift: 2 nos of 680 kg
Clear Door Dimension: 800 x 2300 mm
Available for private vehicle, motorcycle and bicycle
Approx. 9.3m2 / TR for tenant area
Chilled water supply tee-off connection for each unit
Condensate drain pipe tee-off connection for each unit
Centralized PAU
Reserved fresh air and exhaust air louvre at Façade at each unit
Relative humidity control by desiccant wheel
6 nos. of air exchanges per hour
General exhaust shaft to roof level at each unit
Allocated space on roof for tenant's installation of the fume exhaust fan
Emergency exhaust, emgerency shower and eye-washer provided at corridors
Fire hydrant, hose reel system, automatic sprinkler system, fire alarm and detection system, portable fire extinguishing devices provided.
Water supply and drainage connection point at each unit
Centralized neutralization system with chemical waste water pipe tee-off point
Dual cable risers
365 VA/sq m for G/F
294 VA/sq m for 1/F-7/F
72 VA/sq m for G/F (12 hours)
59 VA/sq m for 1/F-7/F (12 hours)
Centralized system with connection point at each unit for the following supply: Non-potable water, Purified water (type II), Carbon dioxide (CO2), Nitrogen (N2), Vacuum, Compressed air, Chemical drain, Town gas
CCTV monitoring in public area
Access control system
Security gate at lobby
BEAM Plus New Buildings V2.0
Provisional Platinum

Typical Floor Plan


The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.
In case of any discrepancy between the English version, the traditional Chinese version and the simplified Chinese version, the English version shall prevail. The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.








