Buildings 2 & 3

General Specifications

Property 1=Building Function
Building Function

Wet laboratory enabled building

Property 1=Typical Floor Area
Total Gross Floor Area (Combined)

Approx. 32,763 m2

Property 1=Lab Provisions
Lab Provisions

Biosafety Level 2 and 3

Property 1=Green Building Award And Accreditation
Green Building Awards and Accreditations

LEED Building Design + Construction Pre-Certification Gold

Property 1=Typical Floor Area
Typical Floor Area

Approx. 1,850 m2 for 2/F - 9/F (4/F omitted)

Approx. 1,700 m2 for 2/F - 9/F (4/F omitted)

Property 1=Typical Structural Clearance
Structural Clearance (from floor to floor)

Approx. 5.00 m for 2/F - 8/F (4/F omitted)

Approx. 6.00 m for 9/F

Property 1=Floor Loading
Floor Loading

10 kPa for 2/F - 5/F (4/F omitted)

8 kPa for 6/F - 8/F

12 kPa for 9/F

Property 1=Air Conditioning & Mechanical Ventilation
Air-conditioning & Mechanical Ventilation

Approx. 9.29 m2 / TR for 2/F - 8/F (4/F omitted)

Approx. 3.72 m2 / TR for 9/F

Property 1=Normal Electricity Supply
Normal Electricity Supply 

Approx. 350 VA/m2 for 2/F - 5/F (4/F omitted)

Approx. 295 VA/m2 for 6/F - 8/F

Approx. 450 VA/m2 for 9/F 

Property 1=Lab Provisions
Provisions

Various gas and purified water (Type II) supply

Centralized neutralization system for chemical disposal

Emergency exhaust, emergency shower and eye-washer provided at corridors

General & Key Building Specifications

 
Building 2
Building 3
Building Function

Wet laboratory enabled building

Usage

Research and development 

Lab Provisions

Biosafety Level 3 for G/F - 1/F & 9/F enabled

Biosafety Level 2 for 2/F - 8/F  (4/F omitted) enabled

Total Gross Floor Area (Combined)

Approx. 32,763 m2

No. of Floor

9 levels (4/F omitted)

G/F - 9/F: Wet Laboratory

B1/F & B2/F#: Food Court, Retail, Car Park & Loading / Unloading Bay

 

 

 

Typical Floor Area

Approx. 1,850 m2 for 2/F - 9/F (4/F omitted)

Approx. 1,700 m2 for 2/F - 9/F (4/F omitted)

Floor to Floor Height

Approx. 5.00 m for 2/F - 8/F (4/F omitted)

Approx. 6.00 m for 9/F

Structural Clearance (from structral floor level to soffit of slab above)

Approx. 4.80 m for 2/F - 8/F (4/F omitted)

Approx. 5.80 m for 9/F

Structural Clearance (from structral floor level to soffit of the deepest beam)

Approx. 4.00 m for 2/F - 8/F (4/F omitted)

Approx. 5.00 m for 9/F

Clear Headroom

2.80 m to 3.00 m

Suspended Ceiling

N/A

Floor Loading

10 kPa for 2/F - 5/F (4/F omitted)

8 kPa for 6/F - 8/F

12 kPa for 9/F

Vibration Class

VC-A

Dangerous Goods Stores

7 nos. at G/F for tenant storage use enabled to Class 2 DG store

Tenant is required to apply DG license

9 nos. at G/F for tenant storage use enabled to Class 2 DG store

Façade

IGU Glass

Dedicated intake and exhaust lourves

Lift Provisions

Passenger Lift 4 nos. of 1,600 kg

Clear Door Dimension (Width x Height): 1,100 x 2,300 mm

 

Services Lift: 1 no. of 2,500 kg

Clear Door Dimension (Width x Height): 2,000 x 2,700 mm

 

Fireman Lift: 1 no. of 1,600 kg

Clear Door Dimension (Width x Height): 1,200 x 2,600 mm

 

Parking Facilities

Available for private vehicle, motorcycle and bicycle 

Air-conditioning & Mechanical Ventilation

Approx. 3.72 m2 / TR for 9/F

Chilled water supply tee-off connection for each unit 

Condensate drain pipe tee-off connection for each unit

Centralised PAU for common area 

Reserved fresh air and exhaust air louvre at Façade at each unit 

Tenants may install ventilation equipment achieving up to 6 nos. of air exchanges per hour

General exhaust shaft to roof level at each unit

Allocated space on roof for tenant's installation of the fume exhaust fan 

Emergency exhaust emgerency shower and eye-washer provided at corridors

 

Fire Protection

Fire hydrant, hose reel system, automatic sprinkler system, fire alarm and detection system, portable fire extinguishing devices provided 

Water Supply & Drainage

Water supply and drainage connection point at each unit 

Centralised neutralisation system with chemical waste water pipe tee-off point at each unit 

Chemical Sewage

Centralized neutralization system with chemical waste water pipe tee-off point at each unit 

Normal Electricity Supply

Dual cable risers 

Approx. 350 VA/m2 for 2/F - 5/F (4/F omitted)

Approx. 295 VA/m2 for 6/F - 8/F

Approx. 450 VA/m2 for 9/F 

Standby Power Supply

Approx. 75 VA/m2 for 2/F - 5/F (4/F omitted) (12 hours)

Approx. 72 VA/m2 for 6/F - 8/F (12 hours)

Approx. 80 VA/m2 for 9/F (12 hours)

Technical Gases & Laboratory System

Centralised system with connection point at each unit for the following supply: 

Non-potable water, Purified water (type II), Carbon dioxide (CO2), Nitrogen (N2), Vacuum, Compressed air, Chemical drain & Town gas

Security System

CCTV monitoring in public area

Access control system

Security turnstile at lobby

Green Building Awards and Accreditations

LEED Building Design + Construction Pre-Certification Gold

TYPICAL FLOOR PLAN

Typical Floor Plan
Building 2,3 Floor Plan

# The basement floors of Buildings 2 and 3 and Buildings 5 and 6 (“Basement Floors”), namely B1/F and B2/F, are under planning and their design may change from time to time and are subject to the final plans as approved by the Government. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the right to modify and change the facilities, design, layout, user and specifications of the Basement Floors or any part thereof without prior notice. The shops and/or facilities on the Basement Floors may not be in operation immediately upon the completion of other units of Buildings 2 and 3 and Buildings 5 and 6, and the trade mix, shops and/or facilities of the Basement Floors may change from time to time. The final completion date and opening date are subject to the final announcements by Hong Kong-Shenzhen Innovation and Technology Park Limited.

 

The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.

 

In case of any discrepancy between the English version, the traditional Chinese version and the simplified Chinese version, the English version shall prevail. The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.