Buildings 5 & 6

General Specifications

Property 1=Building Function
Building Function

Dry Laboratory* / Office

Property 1=Typical Floor Area
Total Gross Floor Area (Combined)

Approx. 19,715 m2

Property 1=Normal Electricity Supply
Normal Electricity Supply

Approx. 250 VA/m2 for 2/F

Approx. 180 VA/m2 for 3/F - 9/F (4/F omitted)

Facade Icon (2)
Façade

IGU Glass

Dedicated intake and exhaust louvres

Property 1=Floor Loading
Floor Loading

10 kPa for 2/F

7.5 kPa for 3/F - 6/F (4/F omitted)

5 kPa for 7/F - 9F

Property 1=Typical Structural Clearance
Structural Clearance (from floor to floor)

Approx. 5.00 m for 2/F - 9/F (4/F omitted)

Property 1=Air Conditioning & Mechanical Ventilation
Mechanical Ventilation & Air-conditioning

Approx. 11.15 m2/ TR for 2/F

Approx. 13.94 m2/ TR for 3/F - 9/F (4/F omitted)

Property 1=Green Building Award And Accreditation
Green Building Awards and Accreditations

BEAM Plus New Buildings v2.0 Provisional Platinum

LEED Building Design + Construction Pre-Certification Gold

General & Key Building Specifications

 
Building 5
Building 6
Building Function

Dry Laboratory* / Office

Total Gross Floor Area (Combined)

Approx. 19,715 m2

No. of Floor

9 levels (4/F omitted)

1/F - 9/F: Dry Laboratory* / Office

G/F: Dining / Retail

B1/F & B2/F#: Food Court, Retail, Car Park & Loading / Unloading Bay

Typical Floor Area

Approx. 950 m2 for 2/F - 9/F (4/F omitted)

Approx. 1,100 m2 for 2/F - 9/F (4/F omitted)

Ceiling and Internal Floor

Suspended ceiling and raised floor system

Structural Clearance (from floor to floor)

Approx. 5.00 m for 2/F - 9/F (4/F omitted)

Clear Headroom

2.80 m to 3.15 m

Floor Loading

10 kPa for 2/F

7.5 kPa for 3/F - 6/F (4/F omitted)

5 kPa for 7/F - 9F

Normal Electricity Supply

Approx. 250 VA/m2 for 2/F

Approx. 180 VA/m2 for 3/F - 9/F (4/F omitted)

 

Standby Power Supply

Approx. 72 VA/m2 (12 hours)

Mechanical Ventilation & Air-conditioning

Centralised Air-conditioning (VAV) System

Approx. 11.15 m2/ TR for 2/F

Approx. 13.94 m2/ TR for 3/F - 9/F (4/F omitted)

Reserved fresh air and exhaust air louvre at façade at each unit

Fire Protection

Fire hydrant, hose reel system, automatic sprinkler system, fire alarm and detection system, and portable fire extinguishing devices

Façade

IGU Glass

Dedicated intake and exhaust louvres

Lift Provisions

Passenger Lift: 3 nos. of 1,350 kg

Clear Door Dimension (Width x Height): 1,100 x 2,300 mm

 

Fireman Lift: 1 no. of 2,500 kg

Clear Door Dimension (Width x Height): 2,000 x 2,700 mm

 

Parking Facilities

Available for private vehicle and motorcycle

Bike parking at G/F

Security System

CCTV monitoring in public area

Access control system

Security turnstile at lobby

Green Building Awards and Accreditations

BEAM Plus New Buildings v2.0 Provisional Platinum

LEED Building Design + Construction Pre-Certification Gold

Typical Floor Plan

Typical Office Floor Plan
Building 5,6 Floor Plan

# The basement floors of Buildings 2 and 3 and Buildings 5 and 6 (“Basement Floors”), namely B1/F and B2/F, are under planning and their design may change from time to time and are subject to the final plans as approved by the Government. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the right to modify and change the facilities, design, layout, user and specifications of the Basement Floors or any part thereof without prior notice. The shops and/or facilities on the Basement Floors may not be in operation immediately upon the completion of other units of Buildings 2 and 3 and Buildings 5 and 6, and the trade mix, shops and/or facilities of the Basement Floors may change from time to time. The final completion date and opening date are subject to the final announcements by Hong Kong-Shenzhen Innovation and Technology Park Limited.

 

*Dry labs are for general use with no specific facility requirements, similar to general offices


The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.

 

In case of any discrepancy between the English version, the traditional Chinese version and the simplified Chinese version, the English version shall prevail. The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.