Batch 1A Development
Completion By 2024 - 2025
Building 11
Download Here
Building 11

General Specifications

Property 1=Building Function
Building Function

Talent accommodation

Property 1=Room Type
Room Type

Studio unit: 92 nos.
One bedroom unit: 7 nos.
Accessible unit: 1 no. 

Property 1=Typical Floor Area
Room Area

Studio unit: 23.2 m2
One bedroom unit: 44.6 m2
Balcony 2.0 m2

Property 1=Green Building Award And Accreditation
Green Building Award And Accreditation

BEAM Plus New Buildings V2.0 Provisional Platinum

BEAM Plus Neighbourhood V1.0 Platinum 

LEED Building Design + Construction Pre-Certification Gold 

Green Building Award 2023 - Merit Award 
(Project Under Construction and/or Design - Commericial )

General & Key Building Specifications

Fixture and Furniture
Group 48096212
Fully-furnished
Group 48096213
Wifi
Group 48096215
Private Bathroom
Group 48096217
Air-conditioning
Communal Facility
Group 48096221
Laundry
Group 48096218
Music Room
Group 48096222
Multi-function Room
Group 48096219
Roof Top Garden
Group 48096220
Kitchen
Smart Initiative
Group 48096225
Smart Home System
Group 48096212 (1)
Indoor Air Quality Monitoring
Group 48096224
Biometric Access Control

Typical Floor Plan

Building 11
HSIPT Floorplan LB03 11HSIPT Floorplan LB03 11

The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.

 

In case of any discrepancy between the English version, the traditional Chinese version and the simplified Chinese version, the English version shall prevail. The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.