Buildings 8 & 9
Batch 1A Development
Completion By 2024 - 2025
Download Here
Z8L 1753

General Specifications

Property 1=Building Function
Building Function

Wet laboratory enabled building

Property 1=Typical Floor Area
Total Gross Floor Area (combined)

Approx. 32,000 m2

Property 1=Lab Provisions
Lab Provisions

Biosafety Level 3 / PRC P3 Lab provisions enabled

Property 1=Green Building Award And Accreditation
Green Building Award And Accreditation

BEAM Plus New Buildings V2.0 Provisional Platinum

BEAM Plus Neighbourhood V1.0 Platinum 

LEED Building Design + Construction Pre-Certification Gold 

Green Building Award 2023 - Merit Award 
(Project Under Construction and/or Design - Commericial )

Property 1=Typical Floor Area
Typical Floor Area

Building 8

G/F  Approx. 590 m2
1-8/F (4/F omitted) Approx. 1,900 m2

 

Building 9

G/F  Approx. 790 m2
1-8/F (4/F omitted)  Approx. 2,000 m2

Property 1=Typical Structural Clearance
Typical Structural Clearance

G/F  Approx. 5.75 m
1-8/F (4/F omitted) Approx. 4.62 m

Property 1=Floor Loading
Floor Loading

7.5kPa

Property 1=Air Conditioning & Mechanical Ventilation
Air-conditioning & Mechanical Ventilation

Approx. 9.3 m2 / TR for tenant area

General exhaust shaft to roof level at each unit

Property 1=Normal Electricity Supply
Normal Electricity Supply

365 VA/sq m for G/F

294 VA/sq m for 1/F - 8/F (4/F omitted)

Property 1=Lab Provisions
Provisions

Various gas and purified water (Type II) supply

Centralized neutralization system for chemical disposal

Emergency exhaust, emergency shower and eye-washer provided at corridors

General & Key Building Specifications

 
Building 8
Building 9
Building Function

Wet laboratory enabled building

Usage

Research and development

Lab Provisions

Biosafety Level 3 / PRC P3 Lab provisions enabled

Total Gross Floor Area (combined)

Approx. 32,000 m2

No. of Floor

8 levels (G/F-7/F) of Wet lab. and basement for carpark with loading/unloading bay

Typical Floor Area

Approx. 590 m2 for G/F

Approx. 1,900 m2 for 1/F-7/F

Approx. 790 m2 for G/F

Approx. 2,000 m2 for 1/F-7/F

Floor to Floor Height

Approx. 5.95 m for G/F

Approx. 4.80 m for 1/F-7/F

Structural Clearence (from structural floor level to soffit of slab above)

Approx. 5.75 m for G/F

Approx. 4.62 m for 1/F-7/F

Structural Clearence (from structural floor level to soffit of the deepest beam)

Approx. 4.85 m for G/F

Approx. 4.00 m for 1/F-7/F

Clear Headroom

Typical 2.8 m

Suspended Ceiling

N/A

Floor Loading

7.5kPa

Vibration Class

VC-A for G/F-1/F

Dangerous Goods Stores

8 nos. at G/F for tenant storage use

Façade

IGU Glass

Dedicated intake and exhaust lourves

Lift Provisions

Passenger Lift: 4 nos. of 1,350 kg
Clear Door Dimension: 1100 x 2300 mm

Services Lift: 1 no. of 2,500 kg
Clear Door Dimension: 1800 x 2600 mm

Fireman Lift: 2 nos of 680 kg
Clear Door Dimension: 800 x 2300 mm

Parking Facilities

Available for private vehicle, motorcycle and bicycle

Air-conditioning & Mechanical Ventilation

Approx. 9.3m2 / TR for tenant area

Chilled water supply tee-off connection for each unit

Condensate drain pipe tee-off connection for each unit

Centralized PAU

Reserved fresh air and exhaust air louvre at Façade at each unit

Relative humidity control by desiccant wheel

6 nos. of air exchanges per hour

General exhaust shaft to roof level at each unit

Allocated space on roof for tenant's installation of the fume exhaust fan

Emergency exhaust, emgerency shower and eye-washer provided at corridors

Fire Protection

Fire hydrant, hose reel system, automatic sprinkler system, fire alarm and detection system, portable fire extinguishing devices provided.

Water Supply & Drainage

Water supply and drainage connection point at each unit

Chemical Sewage

Centralized neutralization system with chemical waste water pipe tee-off point

Normal Electricity Supply

Dual cable risers

365 VA/sq m for G/F

294 VA/sq m for 1/F-7/F

Standby Power Supply

72 VA/sq m for G/F (12 hours)

59 VA/sq m for 1/F-7/F (12 hours)

Technical Gases & Laboratory System

Centralized system with connection point at each unit for the following supply: Non-potable water, Purified water (type II), Carbon dioxide (CO2), Nitrogen (N2), Vacuum, Compressed air, Chemical drain, Town gas

Security System

CCTV monitoring in public area

Access control system

Security gate at lobby

Green Building Award And Accreditation

BEAM Plus New Buildings V2.0

Provisional Platinum

Typical Floor Plan

Building 8
HSIPT Floorplan LB03 8HSIPT Floorplan LB03 8

The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.

 

In case of any discrepancy between the English version, the traditional Chinese version and the simplified Chinese version, the English version shall prevail. The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.